Te Papapa is served by Auckland's Onehunga-West Line. It is stop 2 of 19 on the Onehunga ↔ Henderson run, between Onehunga and Penrose. Four things are recorded at this platform and nowhere summarised on its behalf: how late departures were, how many booked trains never came, how long the gap between trains actually ran against the timetabled gap, and how long the ride between here and Newmarket actually took.

Te Papapa

Reliability
92.7%↓ 4.5 pts vs prev 14d

How many of the trains timetabled to stop here actually did.

A train that skipped this station, or was cut short before reaching it, counts as not coming. For anyone waiting here, it never came.

Lateness isn't counted here. A train 12 minutes late still turned up, and shows in punctuality instead.

Trains only. Trips due while our recording was down are left out, not counted as failures.

How we measure

Day by day: trips that ran

14 Oct – 27 Oct

What happened to the timetabled stops here

Of the 1,009 stops the timetable promised at this station.

Turned up93592.7%
Skipped151.5%
Never seen595.8%